Development of an independent production unit based on the valorization of biomass

Client

iED Invest

Country

Cambodia

Period

2012 – 2013

Funding

Equity – Bank loan – UNIDO

iED Invest engaged its sister company for the development and construction of its first gas plant in Cambodia, overseeing the project up until its commissioning.

Project development

  • Site Identification: Analyzing biomass resources and securing land.
  • Legal Approvals: Obtaining necessary approvals from relevant authorities.
  • Fundraising and Financing: Establishing the financial framework for the project.
  • Technical Studies: Designing the power plant through detailed technical studies.
  • Tender Preparation: Preparing consultation files and awarding contracts

Supervision of the construction of the plant and assistance with operation

The gas generating plant includes a gas production unit (rice husk – 200kW), a generator set (70kW), and a dual fuel generator set (130kW). iED Consult provided:

  • Work control
  • Commissioning
  • Monitoring of operations during the first 6 months

The energy produced is sold to a local distributor. 6 months after commissioning in July 2012, the number of distributor customers increased from 400 to 1000.

Développement d´une unité de production indépendante basée sur la valorisation de biomasse